Unnat Patel

Library · Evidence · 5 minutes

Library

Inspect the evidence.

Every sample document, tool, definition and long-form account in one place. Documents, Toolkit and Writing are the three groups; search reaches individual sections.

The supporting material

Library

A closer look
at the work.

Documents that explain a decision. Methods that make it repeatable. Longer accounts of what I built and learned.

Open Toolkit 218 entries · tools, standards & methods

01 / Healthcare & EDI

From the project
to the document.

Two separate projects at Cigna Supplemental Benefits. Start with the work, then inspect the supporting sample or operating record.

CignaCigna Supplemental Benefits

Historical project · implemented

Paper-to-EDI
claims conversion

Paper claims needed repetitive entry before electronic processing.

My contribution. I collaborated with an external company on OCR and custom rules for CMS-1500 and UB-04 forms.

15 minutessaved per paper claim

Read the project context Preview
The conversion, at a glanceOne source. Two connected outputs.
Paper claimsCMS-1500 / UB-04
OCR + custom rulesExtract · validate · convert
Process the claim837P / 837ITo the claims processor
for adjudication
Keep the originalImage + indexCommon claim ID
for retrieval in OnBase

Simplified view of the conversion project.

Supporting readingReconstructed samples
01Functional requirementsDefine what advances, what stops and why.Preview 02Options & decision recordCompare automation with a reviewable exception path.Preview 03Operator acceptance protocolInspect the expected behavior. Sample status: NOT RUN.Preview
CignaCigna Supplemental Benefits

Historical investigation · daily control implemented

Daily claims
reconciliation

A processed-claims report could miss claims that never reached it.

My contribution. I extended a testing observation into a three-year, 20-million-claim investigation and put a daily received-versus-processed audit in place.

300,000 claimsfound unprocessed · about $10M in claim value

Read the project context Preview
The operating questionWhat was received but never processed?
Received inventoryProcessed inventory
Source-file A✓ Matched
Source-file B! Investigate the gap
Source-file C✓ Matched

Compare by source-file ID Surface fallout Recheck daily

Illustrative records explain the comparison; they are not a historical batch.

Supporting readingCase-based sample format
01Missing-claims operating recordConnect the finding, recovery and continuing control.Preview

This daily audit is separate from Paper-to-EDI conversion, provider resolution and the integration-platform replacement.

02 / Toolkit & reference

A working
reference shelf.

Look up a method, term or document type. Contribution labels distinguish personal work, delivery context and familiarity.

03 / Book & paper

The longer
account.

Follow the technical detail, collaboration and lessons behind the decisions.

04 / Commerce

From a buying
need to an order.

Amazon Business accounts connect procurement workflows with product strategy and adoption.

05 / Applied AI

What I have
built with AI.

Production product ownership, a personal product and technical exploration each keep their own context.

Read the complete source →

Close this panel to return to your place in the Library.

Explore the document journey

See the decision inside the document.

Seven stages. Readable previews. Open the supporting documents when you need the detail.

Portfolio samples from my healthcare product experience. Requirements, thresholds and review records are illustrative; they are not employer documents or historical sign-offs.

Discover · 2 documents

Find the problem before choosing the system.

Document quality

Readable source.
Verified fields.

Paper claim conversion

Provider identity

Trustworthy evidence.
Explicit match state.

Provider resolution

Transaction continuity

Receiver state.
Recovery ownership.

Platform replacement

Separate projects; their outcomes are not combined.

Three product problems. Separate evidence.
Read 2 supporting documents

Define · 8 documents

Choose the option and name its boundaries.

A · Fallback baseline

Manual optimization

Less disruption

Repetitive entry remains
B · Selected sample path

OCR + validated transaction + review

Eligible automation

Inspectable exceptions
C · Rejected in sample

Unrestricted straight-through processing

Apparent automation

Unresolved identity & quality risk
The decision is visible in the comparison.
Read 8 supporting documents

Design · 1 document

Make the exception path part of the interface.

ReceivePreserve the sourceExtractCandidate fieldsResolveProvider evidenceValidate837 transaction
Unreadable / conflictingMissing / ambiguousValidation fails
Authorized reviewCorrect · resolve · return a specific exception
Adjudication remains a separate decision. OCR does not decide coverage.
A candidate becomes a transaction through explicit checks.
Read the document

Build · 3 documents

Pair each feature with a usable exception path.

FeatureStory / acceptanceDependency
IntakeClassify, extract, correct, holdVendor / form contract
ProviderNormalize and resolve explicitlyCentral data access
HandoffValidate; observe receiver stateReceiver contract
ContinuityDuplicate control; reconcileStable identity & inventory
OperationsRoles and review reportingQueue ownership

Platform replacement retains its own epic and migration dependencies.

Features carry acceptance into the story map.
Read 3 supporting documents

Validate · 3 documents

Require the evidence before making the release decision.

GateSample evidence status
Input & provider qualityExpected cases documented
Transaction integrityExecution evidence not supplied
Operational readinessApproval not supplied
Data controlsApproval not supplied
Platform cutoverSeparate decision required

No status above represents a historical sign-off.

Required evidence is not an approval.
Read 3 supporting documents

Launch · 5 documents

Expand only while quality and capacity support it.

ValidateSanctioned test casesObserveRestricted approved scopeExpandAdditional eligible cases
Pause forUnintended duplicatesMissing inventoryUnauthorized accessUnsupported provider selection
Restore approved route → reconcile identities → replay

Platform transition requires independently approved consumers and separate evidence.

Every increase has an exit condition and a way back.
Read 5 supporting documents

Operate & learn · 9 documents

Change the cause, not the rule that exposes it.

Signal: some provider matches were wrong
Measure a month of claims with and without the rule.
Remove the ruleAdditional manual fallout

The wrong matches are real; removal creates a larger operating consequence.

Fix identity at its sourceProvider-master proof of concept

Test the replacement source before funding the migration.

Identity, reconciliation and claim-file shredding were distinct projects.

Compare the consequence before removing a control.
Read 9 supporting documents

01

Product documents

02

Tools and definitions

03

Long-form writing

Evidence · 15 minutes

Product artifact catalog

The documents behind delivery.

The original artifact catalog, retained alongside the healthcare product journey.

01 · The number that decides whether anything gets built — in three kinds of metric

Inside it

  • Input metrics — the things we control: volume in, coverage, configuration, adoption of a process.
  • Output metrics — the results: cost per unit, throughput, conversion, cycle time.
  • Defect metrics — what went wrong along the way: error rate, exceptions, rework, false positives.
  • The query or extraction method, the population, the period, and what was excluded.
  • One recommendation, sized bottom-up.
When · who
  • Written before any requirement; refreshed after launch to close the loop.
  • Read by the partner teams who must agree on the problem, and by leadership in the review.
From the record
  • Dispense analysis identified a mismatch between reviewed and later context.
  • Quote-funnel analysis identified demand excluded by the existing response path.
  • Claims reconciliation identified records missing from completion reporting.
02 · What operators and customers said, one team at a time, then combined
Inside it
  • Interview notes per stakeholder team or customer segment.
  • Observed friction from shadowing, with time stamps.
  • Themes ranked by frequency and by cost.
  • Verbatim quotes that will appear in the PR/FAQ.
When · who
  • Before the press release is written. Read by design, product and the sponsors.
From the record
  • A stakeholder workshop to define a product direction under a safety bar.
  • Enterprise customer demos and partner reviews informing the integration roadmap.
  • Operator feedback informing post-launch learning.
03 · Bottom-up from actuals, never top-down from a planning number
Inside it
  • Addressable volume, from the warehouse.
  • Unit cost today and after; the delta in cents per unit.
  • Assumptions listed, each with its source.
  • Sensitivity: what happens if the biggest assumption is half right.
When · who
  • Before roadmap commitment; re-run at each planning cycle. Read by finance and leadership.
From the record
  • A planning opportunity re-sized from actuals came in below the initial estimate before roadmap commitment.
04 · How the work actually happens today, drawn from the operator's chair
Inside it
  • Swimlanes by role and system; hand-offs marked.
  • Time and volume on every step; exception paths drawn, not footnoted.
  • The step where the defect enters.
When · who
  • During discovery; the baseline the to-be flow is measured against.
From the record
  • Business-impact analysis and as-is/to-be flows across partner departments for an enterprise program.
  • Transaction flows for a retail platform moving to a new delivery model.
05 · The press release for launch day, and the hard questions, written before anything is scheduled
Inside it
  • One-page press release: headline, customer, problem, solution, a customer quote, how to get started.
  • Customer FAQ — what a customer would ask.
  • Internal FAQ — the hard questions: cost, risk, what we are not doing, what could go wrong, how we would know.
When · who
  • First document for any 0→1 product. Reviewed by senior leadership before funding.
From the record
  • A clinical-support concept with appropriate professional authority.
  • A customer-care platform proposal.
  • A hosted enterprise catalog taken from concept into a pilot.
06 · Where a product line is going over several years, and why the first step is the first step
Inside it
  • Current state with numbers; the future state in the operator's terms.
  • Staged vision — assisted → primary — with the evidence required to move between stages.
  • Non-goals and constraints; dependencies on other teams.
When · who
  • When a portfolio needs a north star. Read by partner leaders and used to align funding.
From the record
  • A tooling vision connecting cost and user effort.
  • A safety-workflow current state and future direction.
  • A clinical-assistance vision with accountable boundaries.
07 · Which bets, in which order, and what we will stop doing
Inside it
  • The customer and the job; the competitive or operational position.
  • Three to five bets with the metric each moves.
  • Sequencing and the reason for it; explicit stops.
  • Risks and the two-way / one-way door classification of the big decisions.
When · who
  • Annually and on major pivots. Read by leadership and the teams who will execute.
From the record
  • A quoting strategy that reconsidered the response path and pricing predictability.
  • A platform-modernization strategy connecting service boundaries and user needs.
08 · The long arc, with the milestones that let you check you are still on it
Inside it
  • Year-by-year outcomes; the capability built each year.
  • Investment and savings by year, in unit economics.
  • Leading indicators for year one that predict year three.
When · who
  • Planning season. Read by senior leadership; referenced in every quarterly review.
From the record
  • A multi-year plan for applied AI in pharmacy operations.
  • A multi-year plan for marketplace integration products.
  • An internal-procurement expansion and its investment case.
09 · Where the product line fits the company's plan, and what it asks for
Inside it
  • The enterprise theme this work serves and the metric the company tracks.
  • Asks: headcount, funding, dependencies on other organisations.
  • Goals for the year with owners; the ones we will report on monthly.
When · who
  • Annual operating plan cycles (OP1 in the autumn, OP2 refresh in the new year). Read at the executive level.
From the record
  • A planning theme connecting assistance with product capability.
  • A funding case for an enterprise data platform.
10 · How a product reaches customers — every lever, with a number on it
Inside it
  • Segments and verticals; the adoption target.
  • Levers: sales goals, professional-services onboarding, self-serve product, marketing, partner-generated leads.
  • Onboarding time as a product metric.
  • Region-by-region sequencing and enablement.
When · who
  • Before a launch or a channel turnaround. Read by sales, services, marketing and partner leaders.
From the record
  • An integration-channel go-to-market strategy connecting sales, services, self-service, marketing and partners with adoption.
11 · What we are building, what we are not, and how we will know — versioned and capped
Inside it
  • Problem, users, scope and non-goals.
  • Success criteria with target values; the defect metric paired with every automation.
  • Functional requirements by workflow; exception handling written out, not "TBD".
  • Risk register; open questions with owners; version history.
When · who
  • Numbered versions through review; signed by each partner team. Capped — a forced pilot decision after too many rounds.
From the record
  • Safety-service requirements; review-context requirements aligned with specialist partners; billing and hosted-catalog requirements refined through analysis.
12 · Start at the hard date and walk backwards until you reach today
Inside it
  • The immovable date and what makes it immovable.
  • Milestones backwards from it, each with an owner and an exit criterion.
  • Dependencies and the slack — or the lack of it — on each.
When · who
  • Any regulatory deadline or platform deprecation. Read weekly in the business review.
From the record
  • A pharmacy launch planned backward from a compliance obligation, with readiness evidence and a bounded introduction.
  • A customer-care transition plan connecting migration and future capability.
13 · Every screen, rule and message, precisely enough to build and test from
Inside it
  • Functional behaviour by screen or service: inputs, validations, outputs, messages.
  • Business rules as tables; state transitions as diagrams.
  • Error and exception handling per rule.
  • Traceability to the BRD requirement each function satisfies.
When · who
  • Design phase; owned with the analyst and engineering lead. Read by engineers and testers.
From the record
  • A specification converting paper claims to electronic 837 format.
  • Verification-workflow specifications with explicit acceptance conditions.
14 · The technical design — with the product manager writing the problem, constraints and alternatives
Inside it
  • Problem statement and constraints — the product manager's section.
  • Alternatives considered, with the tradeoff that decided it.
  • Architecture, data flow, interfaces; non-functional requirements.
  • Rollout and rollback approach; monitoring.
When · who
  • Before build; reviewed with senior engineers. The product manager signs the constraints and the alternatives.
From the record
  • Synchronous versus asynchronous behavior evaluated against the professional’s responsiveness needs.
  • A quoting response approach chosen against more extensive alternatives, with a follow-on design documented.
15 · Source field, target field, transformation, default, reject — for every attribute
Inside it
  • Field-by-field mapping with data types, formats and required flags.
  • Transformation logic and lookup tables; defaults when the source is empty.
  • Reject rules and where rejects go.
  • Sample records for the test set.
When · who
  • Any migration or integration. Read by engineers, testers and the receiving system's owners.
From the record
  • Enrollment, claims and policy data mapped for a shared-platform migration.
  • Administrative records normalized to a structured representation for bounded assistance.
16 · What the caller sends, what comes back, and what happens when it doesn't
Inside it
  • REST/JSON request and response schemas; event schemas for streaming; file layouts for EDI, cXML, SFTP.
  • Error codes and retry semantics; idempotency keys.
  • Latency and availability expectations.
When · who
  • Design; agreed with partner and platform teams before build.
From the record
  • Verification interfaces with defined responsibilities.
  • Model Context Protocol tool contracts with bounded, documented actions.
  • Pricing and quoting APIs for procurement integration.
17 · Given, when, then — the test written before the story
Inside it
  • Given a precondition, when an action, then an observable result — for the happy path and every exception.
  • Data conditions and boundary values.
When · who
  • Before a story enters a sprint. Read by engineers and testers; the operator's language, not the system's.
From the record
  • Acceptance criteria used across scrum teams in the operator’s language.
18 · The work, broken down so it can be prioritised, estimated and demoed
Inside it
  • Epics tied to a business outcome and a metric; features under them; stories under features.
  • Story format: who, what, why; acceptance criteria attached.
  • Dependencies and enabler work called out, not hidden.
When · who
  • Continuously, in Jira or Jira Align. Read by the teams, the release train and leadership dashboards.
From the record
  • A digital migration divided into epics representing member-facing capabilities and their dependencies.
19 · Cost of delay divided by job size — so the argument is about the inputs, not the ranking
Inside it
  • For each epic: user/business value, time criticality, risk reduction or opportunity enablement — relative scores.
  • Job size in the same relative scale.
  • Weighted shortest job first = cost of delay ÷ size; the ranked list falls out.
When · who
  • Before each program increment. Read by product management and business owners together.
From the record
  • Portfolio prioritization across teams, with enablers and business-value features balanced explicitly.
  • Risk-based prioritization applied to safety work.
20 · Ten to twelve weeks of committed objectives across every team on the release train
Inside it
  • Team objectives for the increment, with business value scored by the business owners.
  • The program board: features by sprint, dependencies drawn as strings between teams.
  • Risks classified — resolved, owned, accepted, mitigated.
When · who
  • Program increment planning, quarterly, two days, everyone in the room. Read for the whole increment.
From the record
  • Release-train planning linking multiple teams, portfolios and a funding cycle.
21 · Two weeks of work made visible — and the flow of work that doesn't fit in sprints
Inside it
  • Sprint goal; stories pulled against capacity; acceptance criteria present on every one.
  • Kanban for operational and support flow: columns as states, work-in-progress limits, aging visible.
  • Demo notes and the decision log.
When · who
  • Every sprint; the board every day. Read by the team; the demo by stakeholders.
From the record
  • Jira and Jira Align across the release train; Kanban for compliance and on-call work where arrival, not planning, sets the pace.
22 · Fixed cadence, variable scope — the train leaves on time
Inside it
  • Increment boundaries, sprint boundaries, system demos, planning days.
  • Release windows and freeze periods; the compliance dates that cannot move.
  • Feature flags that decouple deployment from release.
When · who
  • Set per year; referenced by every team and by operations.
From the record
  • Enrollment work planned against a fixed business date, with continuity and fallback considered.
23 · Every requirement has a test; every test has a result
Inside it
  • Scope by test type: unit, integration, automated regression, performance, UAT, security.
  • Traceability: requirement → test case → result.
  • Test data strategy — generated, masked, production-shaped.
  • Entry and exit criteria; blocked tests with disposition.
When · who
  • Drafted in design; executed in test; read at go/no-go.
From the record
  • Functional tests for a launch, with environment limitations recorded and owned.
  • Masked production-shaped claims used to make representative regression data practical.
24 · The operator's scenarios, run by operators, signed by operators
Inside it
  • Scenarios written in the operator's language — the missing allergy, the rejected file, the customer with two accounts.
  • Free-exploration time built in; defects logged with severity.
  • Sign-off with names and dates.
When · who
  • After integration testing, before go/no-go. Pharmacists, claims processors, sales advisors.
From the record
  • Pharmacist UAT for every clinical workflow change; enterprise customer pilots for integration products.
25 · The new engine against the old, field by field, on thousands of real inputs
Inside it
  • Population replayed; fields compared; parity rate against the threshold.
  • Disagreement classes with a disposition for each — new engine right, defect fixed, accepted difference.
  • Performance under replay load.
When · who
  • Before cutover of any safety or financial engine. The evidence at go/no-go.
From the record
  • Historical comparison and classification of disagreements before changing a safety-related engine.
26 · One approval from each function — written down, with what they saw
Inside it
  • The evidence reviewed: parity, performance, UAT, security.
  • Named approvers from safety, compliance, legal and operations; the conditions attached.
  • Rollback plan and who can call it.
When · who
  • The day before the pilot. Signed by each function's lead.
From the record
  • Cross-functional readiness review for a pharmacy rollout, including explicit scope exclusions.
27 · Pilot → staged expansion, with what we watch and when we stop
Inside it
  • Pilot cohort, site, shift and duration.
  • Step percentages, the metrics held at each step, and the thresholds that stop a step.
  • Named risks with mitigations; day-one production validations.
When · who
  • Written with operations before go/no-go; executed by product with live tracking.
From the record
  • A verification platform introduced in bounded stages; a pharmacy review capability planned against a fixed obligation.
28 · The movement, reported against the criteria set before building
Inside it
  • What launched, for whom, and why it matters.
  • Each success criterion from the BRD with its before/after value.
  • What is next; who to thank.
When · who
  • At 100% dial-up. Read by leadership and every partner team.
From the record
  • Announcements for the safety-service rebuild and the state-reporting automation — latency, automated-success and manual-review movement against pre-set targets.
29 · The operator can use it, and the floor knows what to do when it fails
Inside it
  • Prototype-based walk-through of every scenario, delivered through the learning management system for tracking.
  • Standard operating procedures and one-page job aids.
  • Floor-support plan for day one; escalation paths.
When · who
  • Ships with the launch, not after. Operations training leads and product together.
From the record
  • Prototype-based training for a launch; operating guidance; product enablement across regions.
30 · Onboarding is a product with a cycle time — measure it, then shorten it
Inside it
  • Self-service steps a customer's own team can complete.
  • Configuration checklists per platform; test transactions; go-live criteria.
  • A shared launch-readiness definition so services and sales agree on done.
When · who
  • Any integration product. Read by customers, partners and professional services.
From the record
  • Integration onboarding improved through clearer self-service guidance and a shared readiness definition.
31 · Input metrics, output metrics, defect metrics — the same page every week, so the trend is the story
Inside it
  • The metrics deck: inputs we control, outputs we get, defects we created — each with trend and target.
  • Variance commentary only where the line moved; actions with owners and dates.
  • Quarterly: goals status, roadmap changes, asks of leadership.
When · who
  • Weekly with the channel; monthly with partners; quarterly with executive stakeholders across regions.
From the record
  • Channel insights, partner reviews and portfolio-level reporting across regions.
32 · The portfolio on one page: outcomes, lowlights, next decisions
Inside it
  • Highlights with the number moved; lowlights with the cause and the fix.
  • Decisions needed from leadership, stated as options.
  • Portfolio health: on track, at risk, blocked — and why.
When · who
  • Monthly; created and owned by me. Read from director to vice-president.
From the record
  • A product review bringing portfolio outcomes, lowlights and next decisions together for leadership.
33 · Root cause, the mechanism that prevents recurrence, the metric that would have caught it
Inside it
  • Timeline of the incident; customer and business impact quantified.
  • Five whys to root cause — a mechanism failure, not a person.
  • Actions with owners and dates; the monitoring gap closed.
When · who
  • After every significant incident. Read by leadership; the actions tracked to closure.
From the record
  • A failed assistant-to-human transition led to better handoff visibility and recovery.
  • A renewal-related defect was investigated, corrected and given clearer monitoring.
34 · Outcome, defect and cost per unit on one screen — or the launch is not done
Inside it
  • Input, output and defect metrics side by side; alarms on the seams between systems.
  • Reconciliation views: received vs processed; source vs configured vs reporting.
  • Drill-down to the record when a number moves.
When · who
  • Live from day one of the dial-up. Read by operations daily and leadership weekly.
From the record
  • Claims reconciliation made completeness visible; exception reporting and operator-throughput tracking supported launch review.

Read actual completed samples.